39
MWp
30
MWac
Siaton
Negros Oriental
2029 Target
Development Progress Track
01
02
03
04
SEC Incorporation & Land Securitization
NGCP System Impact Study Offer
Interconnection Engineering & Intertie
Grid Entry & Commissioning Target
NORSEC was incorporated in September 2025 to secure site control and manage environmental compliance filings across the target site in Barangay Napacao.
National Grid Corporation of the Philippines issued an official Offer of Service for the System Impact Study on 7 September 2026.
Detailed engineering studies, grid stability assessments, and substation intertie design proceed in coordination with regional utility transmission standards.
Targeted project energization scheduled for 2029, delivering bulk clean power capacity directly into the Visayas grid network.


Full Advantage
Project Execution
Full Advantage Phils. International, Inc. serves as the lead technical development partner for the Siaton Solar Power Project, providing engineering oversight, regulatory permitting expertise, and grid connection modeling.
With extensive experience across Philippine renewable infrastructure, Full Advantage collaborates with NORSEC to maintain institutional rigor across every stage of project development and technical validation.
Qualified institutional investors and utility partners are invited to evaluate technical documentation and regulatory filings for the Siaton project pipeline.